adccommunitymod (AutomationDirect) asked a question.
Created Date: November 14,2014
Created By: Lfrye
**** This post has been imported from our legacy forum. Information in this post may be outdated and links contained in the post may no longer work.****
Looking for some input on my upcoming project. I am converting a large lathe from relay logic to PLC.( not practical to go CNC on this machine) I want to have a Master PLC and 2 remote I/Os. I already have a P3 550 with power supply and all the I/O I need for master. All I would need are the remote racks and associated parts. Or should I start fresh with a Do-More and terminator I/O? Which seems more streamlined than the P3000. Thanks
Created Date: November 14,2014
Created by: ControlsGuy
I have no experience with P3K, but Do-More is a very very good product. I probably wouldn't bother with terminator I/O. Just use 205 remotes with EBCs.
Created Date: November 14,2014
Created by: Lfrye
Looking for some input on my upcoming project.
I am converting a large lathe from relay logic to PLC.( not practical to go CNC on this machine)
I want to have a Master PLC and 2 remote I/Os. I already have a P3 550 with power supply and all the I/O I need for master. All I would need are the remote racks and associated parts. Or should I start fresh with a Do-More and terminator I/O? Which seems more streamlined than the P3000.
Thanks